Aerospace Manufacturing ERP: AS9100 Rev D, Serialized Lineage & First Article Inspection
Deliver flight-critical components with uncompromised genealogy. Maintain complete serialized birth records from titanium ingot to airframe assembly.
Source Integrity Rule: DCAA accounting module alignment subject to specific contract compliance review [PRODUCT CAPABILITY TO CONFIRM].
Mandatory Regulatory & Quality Standards
Operational Bottlenecks in Aerospace & Defense Manufacturing
Challenge 01
Missing sub-tier supplier material test reports delaying customer shipment sign-off
Challenge 02
Unsynchronized drawing revisions resulting in scrap on five-axis CNC machining centers
Challenge 03
Complex government audit requirements demanding granular labor time allocation
End-to-End Shop Floor Execution Workflow
Raw Billet Serialization
Aerospace-grade alloys laser-etched with unique serial numbers linked to raw mill test reports.
AS9102 First Article Inspection
First part off the machining line measured against CMM coordinate models before batch continuation.
Special Processing Tracking
Parts tracked through NADCAP-accredited heat treat, anodizing, and non-destructive testing (NDT).
As-Built Configuration Package
System compiles digital data package containing all inspection reports, material certificates, and concession logs.
Core Functional Modules for Aerospace & Defense Manufacturing
Key Industry Performance Indicators (KPIs)
Target KPI 01
AS9102 FAI Pass Rate
Target KPI 02
First Pass Yield (FPY)
Target KPI 03
Serialized Scrap Cost
Target KPI 04
DCAA Labor Variance
Frequently Asked Architecture & Compliance Questions
Does Werkora support serialized component birth records?
Yes. Every serialized unit maintains a complete lineage history showing parent BOM, operator IDs, machine hours, and inspection values.